US Bridges

CR 300S over Jackson Run

Good

Boone County, Indiana · 00.65 W of CR 875 E · Structure no. 0600240

Built
2024
1 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
72 ft
1 main span
Daily traffic
2,300
2023 count
Owner
County
County Highway Agency

About this bridge

CR 300S over Jackson Run is a prestressed concrete stringer/multi-beam or girder carrying CR 300S over Jackson Run in Boone County, Indiana. It was built in 2024, so it is 1 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,300 vehicles a day, roughly 8% of them trucks, projected to reach 3,340 by 2043. The structure is 72 ft (22 m) long and 81 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 300S
CrossesJackson Run
Location00.65 W of CR 875 E
RouteCounty Highway 300
StateIndiana
Coordinates39.99767, -86.31565
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.5 US tons
Inventory rating66 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length72 ft (22 m)
Longest span70 ft (21.3 m)
Deck width81 ft (24.7 m)
Roadway width58 ft (17.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,300 (2023)
Projected traffic3,340 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 300S over Jackson Run built?

It was built in 2024, making it 1 years old in 2025.

What condition is CR 300S over Jackson Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does CR 300S over Jackson Run carry?

About 2,300 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is CR 300S over Jackson Run?

The structure is 72 ft (22 m) long with a longest span of 70 ft (21.3 m) and a deck 81 ft wide.

Who owns CR 300S over Jackson Run?

It is owned by the County Highway Agency.