CR 675W over W Fork Big Walnut Creek
FairBoone County, Indiana · 00.20 N of CR 800 S · Structure no. 0600155
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 68 ft
- 2 main spans
- Daily traffic
- 10
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
CR 675W over W Fork Big Walnut Creek is a prestressed concrete box beam or girders - multiple carrying CR 675W over W Fork Big Walnut Creek in Boone County, Indiana. It was built in 1988, so it is 37 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 20 by 2037. The structure is 68 ft (20.7 m) long and 24 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 675W over W Fork Big Walnut Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is CR 675W over W Fork Big Walnut Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does CR 675W over W Fork Big Walnut Creek carry?
About 10 vehicles per day (2017 count), of which roughly 10% are trucks.
How long is CR 675W over W Fork Big Walnut Creek?
The structure is 68 ft (20.7 m) long with a longest span of 45 ft (13.7 m) and a deck 24 ft wide.
Who owns CR 675W over W Fork Big Walnut Creek?
It is owned by the County Highway Agency.