US Bridges

Division Road over Mud Creek

FairPosted for load

Benton County, Indiana · 00.10 W of CR 1100 W · Structure no. 0400030

Built
1982
43 years old
Condition
Fair
inspected May 2023
Type
Slab
Concrete Continuous
Length
83 ft
3 main spans
Daily traffic
83
2013 count
Owner
County
County Highway Agency

About this bridge

Division Road over Mud Creek is a concrete continuous slab carrying Division Road over Mud Creek in Benton County, Indiana. It was built in 1982, so it is 43 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 83 vehicles a day, roughly 8% of them trucks, projected to reach 103 by 2033. The structure is 83 ft (25.3 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesDivision Road
CrossesMud Creek
Location00.10 W of CR 1100 W
RouteCounty Highway 0
StateIndiana
Coordinates40.60781, -87.52431
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating33.6 US tons
Inventory rating20.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length83 ft (25.3 m)
Longest span32 ft (9.7 m)
Deck width26 ft (8 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic83 (2013)
Projected traffic103 by 2033
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Division Road over Mud Creek built?

It was built in 1982, making it 43 years old in 2025.

What condition is Division Road over Mud Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Division Road over Mud Creek carry?

About 83 vehicles per day (2013 count), of which roughly 8% are trucks.

How long is Division Road over Mud Creek?

The structure is 83 ft (25.3 m) long with a longest span of 32 ft (9.7 m) and a deck 26 ft wide.

Who owns Division Road over Mud Creek?

It is owned by the County Highway Agency.