US Bridges

CR 950 S over I-65

Fair

Bartholomew County, Indiana · 02.93 N SR 11 · Structure no. 035430

Built
1960
65 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
219 ft
4 main spans
Daily traffic
432
2022 count
Owner
State
State Highway Agency

About this bridge

CR 950 S over I-65 is a concrete continuous stringer/multi-beam or girder carrying CR 950 S over I-65 in Bartholomew County, Indiana. It was built in 1960, so it is 65 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 432 vehicles a day, roughly 3% of them trucks, projected to reach 498 by 2039. The structure is 219 ft (66.9 m) long and 29 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesCR 950 S
CrossesI-65
Location02.93 N SR 11
RouteCounty Highway 0
StateIndiana
Coordinates39.06196, -85.9204
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating25.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length219 ft (66.9 m)
Longest span68 ft (20.7 m)
Deck width29 ft (8.8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic432 (2022)
Projected traffic498 by 2039
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 950 S over I-65 built?

It was built in 1960, making it 65 years old in 2025.

What condition is CR 950 S over I-65 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does CR 950 S over I-65 carry?

About 432 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is CR 950 S over I-65?

The structure is 219 ft (66.9 m) long with a longest span of 68 ft (20.7 m) and a deck 29 ft wide.

Who owns CR 950 S over I-65?

It is owned by the State Highway Agency.