US Bridges

I-469 WB over Feighner Road

Good

Allen County, Indiana · 00.54 E I-69 · Structure no. 032823

Built
1988
37 years old, rebuilt 2018
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
122 ft
3 main spans
Daily traffic
11,807
2019 count
Owner
State
State Highway Agency

About this bridge

I-469 WB over Feighner Road is a prestressed concrete continuous stringer/multi-beam or girder carrying I-469 WB over Feighner Road in Allen County, Indiana. It was built in 1988 and reconstructed in 2018, so it is 37 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,807 vehicles a day, roughly 33% of them trucks, projected to reach 12,013 by 2034. The structure is 122 ft (37.3 m) long and 60 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-469 WB
CrossesFeighner Road
Location00.54 E I-69
RouteInterstate 469
StateIndiana
Coordinates40.96136, -85.28153
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.7 US tons
Inventory rating53.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length122 ft (37.3 m)
Longest span44 ft (13.5 m)
Deck width60 ft (18.4 m)
Roadway width57 ft (17.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,807 (2019)
Projected traffic12,013 by 2034
Trucks33%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-469 WB over Feighner Road built?

It was built in 1988, making it 37 years old in 2025. It was reconstructed in 2018.

What condition is I-469 WB over Feighner Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I-469 WB over Feighner Road carry?

About 11,807 vehicles per day (2019 count), of which roughly 33% are trucks.

How long is I-469 WB over Feighner Road?

The structure is 122 ft (37.3 m) long with a longest span of 44 ft (13.5 m) and a deck 60 ft wide.

Who owns I-469 WB over Feighner Road?

It is owned by the State Highway Agency.