West Hamilton RD over Beal-Taylor Drain
GoodAllen County, Indiana · 00.30 S SR 14 · Structure no. 0200675
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected June 2024
- Type
- Slab
- Concrete Continuous
- Length
- 78 ft
- 3 main spans
- Daily traffic
- 2,438
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
West Hamilton RD over Beal-Taylor Drain is a concrete continuous slab carrying West Hamilton RD over Beal-Taylor Drain in Allen County, Indiana. It was built in 2018, so it is 7 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,438 vehicles a day, roughly 5% of them trucks, projected to reach 3,643 by 2038. The structure is 78 ft (23.7 m) long and 63 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was West Hamilton RD over Beal-Taylor Drain built?
It was built in 2018, making it 7 years old in 2025.
What condition is West Hamilton RD over Beal-Taylor Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does West Hamilton RD over Beal-Taylor Drain carry?
About 2,438 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is West Hamilton RD over Beal-Taylor Drain?
The structure is 78 ft (23.7 m) long with a longest span of 30 ft (9.2 m) and a deck 63 ft wide.
Who owns West Hamilton RD over Beal-Taylor Drain?
It is owned by the County Highway Agency.