Tillman RD over Trier Drain
FairAllen County, Indiana · 00.50 E Hessen Cassel RD · Structure no. 0200296
- Built
- 1975
- 50 years old, rebuilt 1994
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 7,050
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Tillman RD over Trier Drain is a prestressed concrete box beam or girders - multiple carrying Tillman RD over Trier Drain in Allen County, Indiana. It was built in 1975 and reconstructed in 1994, so it is 50 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,050 vehicles a day, roughly 5% of them trucks, projected to reach 10,000 by 2036. The structure is 34 ft (10.4 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tillman RD over Trier Drain built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 1994.
What condition is Tillman RD over Trier Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Tillman RD over Trier Drain carry?
About 7,050 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Tillman RD over Trier Drain?
The structure is 34 ft (10.4 m) long with a longest span of 31 ft (9.4 m) and a deck 44 ft wide.
Who owns Tillman RD over Trier Drain?
It is owned by the County Highway Agency.