Rose Ave over Trier Drain
FairAllen County, Indiana · 00.10 W Landin RD · Structure no. 0200138
- Built
- 1970
- 55 years old, rebuilt 1999
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 102 ft
- 3 main spans
- Daily traffic
- 5,500
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Rose Ave over Trier Drain is a prestressed concrete continuous box beam or girders - single or spread carrying Rose Ave over Trier Drain in Allen County, Indiana. It was built in 1970 and reconstructed in 1999, so it is 55 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,500 vehicles a day, roughly 5% of them trucks, projected to reach 9,500 by 2036. The structure is 102 ft (31 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rose Ave over Trier Drain built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 1999.
What condition is Rose Ave over Trier Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Rose Ave over Trier Drain carry?
About 5,500 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Rose Ave over Trier Drain?
The structure is 102 ft (31 m) long with a longest span of 34 ft (10.3 m) and a deck 31 ft wide.
Who owns Rose Ave over Trier Drain?
It is owned by the County Highway Agency.