US Bridges

TR 85 over Partridge Crk

Poor

Woodford County, Illinois · 2 MI N of Metamora · Structure no. 102318900000000

Built
1997
28 years old
Condition
Poor
inspected November 2024
Type
Channel Beam
Concrete
Length
40 ft
1 main span
Daily traffic
50
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 85 over Partridge Crk is a concrete channel beam carrying TR 85 over Partridge Crk in Woodford County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 50 vehicles a day, roughly 18% of them trucks, projected to reach 51 by 2046. The structure is 40 ft (12.2 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesTR 85
CrossesPartridge Crk
Location2 MI N of Metamora
RouteCounty Highway 0
Coordinates40.82133, -89.36477
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating59.3 US tons
Inventory rating35.7 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length40 ft (12.2 m)
Longest span37 ft (11.3 m)
Deck width26 ft (8 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2020)
Projected traffic51 by 2046
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 85 over Partridge Crk built?

It was built in 1997, making it 28 years old in 2025.

What condition is TR 85 over Partridge Crk in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2024.

How much traffic does TR 85 over Partridge Crk carry?

About 50 vehicles per day (2020 count), of which roughly 18% are trucks.

How long is TR 85 over Partridge Crk?

The structure is 40 ft (12.2 m) long with a longest span of 37 ft (11.3 m) and a deck 26 ft wide.

Who owns TR 85 over Partridge Crk?

It is owned by the Town or Township Highway Agency.