TR 85 over Partridge Crk
PoorWoodford County, Illinois · 2 MI N of Metamora · Structure no. 102318900000000
- Built
- 1997
- 28 years old
- Condition
- Poor
- inspected November 2024
- Type
- Channel Beam
- Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 50
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 85 over Partridge Crk is a concrete channel beam carrying TR 85 over Partridge Crk in Woodford County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 50 vehicles a day, roughly 18% of them trucks, projected to reach 51 by 2046. The structure is 40 ft (12.2 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 85 over Partridge Crk built?
It was built in 1997, making it 28 years old in 2025.
What condition is TR 85 over Partridge Crk in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2024.
How much traffic does TR 85 over Partridge Crk carry?
About 50 vehicles per day (2020 count), of which roughly 18% are trucks.
How long is TR 85 over Partridge Crk?
The structure is 40 ft (12.2 m) long with a longest span of 37 ft (11.3 m) and a deck 26 ft wide.
Who owns TR 85 over Partridge Crk?
It is owned by the Town or Township Highway Agency.