FAS 1348 Ch 14 over Ditch Mole Creek
FairWoodford County, Illinois · 4 MI E Minonk · Structure no. 102302700000000
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Concrete Continuous
- Length
- 54 ft
- 3 main spans
- Daily traffic
- 375
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 1348 Ch 14 over Ditch Mole Creek is a concrete continuous slab carrying FAS 1348 Ch 14 over Ditch Mole Creek in Woodford County, Illinois. It was built in 1961, so it is 64 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 375 vehicles a day, roughly 4% of them trucks, projected to reach 379 by 2046. The structure is 54 ft (16.5 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 1348 Ch 14 over Ditch Mole Creek built?
It was built in 1961, making it 64 years old in 2025.
What condition is FAS 1348 Ch 14 over Ditch Mole Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does FAS 1348 Ch 14 over Ditch Mole Creek carry?
About 375 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is FAS 1348 Ch 14 over Ditch Mole Creek?
The structure is 54 ft (16.5 m) long with a longest span of 20 ft (6.1 m) and a deck 28 ft wide.
Who owns FAS 1348 Ch 14 over Ditch Mole Creek?
It is owned by the County Highway Agency.