S. Central Avenue over S. Br. of Kent Creek
GoodWinnebago County, Illinois · 0.06 MI S of Preston · Structure no. 101612400000000
- Built
- 1975
- 50 years old, rebuilt 2011
- Condition
- Good
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 74 ft
- 3 main spans
- Daily traffic
- 3,400
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S. Central Avenue over S. Br. of Kent Creek is a concrete slab carrying S. Central Avenue over S. Br. of Kent Creek in Winnebago County, Illinois. It was built in 1975 and reconstructed in 2011, so it is 50 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,400 vehicles a day, roughly 6% of them trucks, projected to reach 3,838 by 2046. The structure is 74 ft (22.6 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S. Central Avenue over S. Br. of Kent Creek built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2011.
What condition is S. Central Avenue over S. Br. of Kent Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does S. Central Avenue over S. Br. of Kent Creek carry?
About 3,400 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is S. Central Avenue over S. Br. of Kent Creek?
The structure is 74 ft (22.6 m) long with a longest span of 28 ft (8.5 m) and a deck 39 ft wide.
Who owns S. Central Avenue over S. Br. of Kent Creek?
It is owned by the City or Municipal Highway Agency.