US Bridges

Stage Coach Trail over B N Kent Creek

Good

Winnebago County, Illinois · 0.5 W Owen Center RD · Structure no. 101515000000000

Built
2003
22 years old
Condition
Good
inspected April 2022
Type
Culvert
Concrete
Length
27 ft
2 main spans
Daily traffic
575
2017 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Stage Coach Trail over B N Kent Creek is a concrete culvert carrying Stage Coach Trail over B N Kent Creek in Winnebago County, Illinois. It was built in 2003, so it is 22 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 575 vehicles a day, roughly 8% of them trucks, projected to reach 581 by 2046. The structure is 27 ft (8.3 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesStage Coach Trail
CrossesB N Kent Creek
Location0.5 W Owen Center RD
RouteCounty Highway 0
Coordinates42.3263, -89.12784
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.2 US tons
Inventory rating43.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length27 ft (8.3 m)
Longest span13 ft (3.9 m)
Deck width38 ft (11.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic575 (2017)
Projected traffic581 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stage Coach Trail over B N Kent Creek built?

It was built in 2003, making it 22 years old in 2025.

What condition is Stage Coach Trail over B N Kent Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does Stage Coach Trail over B N Kent Creek carry?

About 575 vehicles per day (2017 count), of which roughly 8% are trucks.

How long is Stage Coach Trail over B N Kent Creek?

The structure is 27 ft (8.3 m) long with a longest span of 13 ft (3.9 m) and a deck 38 ft wide.

Who owns Stage Coach Trail over B N Kent Creek?

It is owned by the Town or Township Highway Agency.