TR-75 (oliver Road over Tunnison Creek
FairPosted for loadWinnebago County, Illinois · 0.5 MI N Knapp Road · Structure no. 101505300000000
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected July 2024
- Type
- Culvert
- Concrete Continuous
- Length
- 39 ft
- 3 main spans
- Daily traffic
- 50
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR-75 (oliver Road over Tunnison Creek is a concrete continuous culvert carrying TR-75 (oliver Road over Tunnison Creek in Winnebago County, Illinois. It was built in 1961, so it is 64 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 39 ft (11.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR-75 (oliver Road over Tunnison Creek built?
It was built in 1961, making it 64 years old in 2025.
What condition is TR-75 (oliver Road over Tunnison Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does TR-75 (oliver Road over Tunnison Creek carry?
About 50 vehicles per day (2017 count).
How long is TR-75 (oliver Road over Tunnison Creek?
The structure is 39 ft (11.8 m) long with a longest span of 13 ft (3.9 m).
Who owns TR-75 (oliver Road over Tunnison Creek?
It is owned by the Town or Township Highway Agency.