US Bridges

College & Granite over West End Creek

Good

Williamson County, Illinois · Marion · Structure no. 100600800000000

Built
1989
36 years old
Condition
Good
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
38 ft
1 main span
Daily traffic
800
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

College & Granite over West End Creek is a prestressed concrete box beam or girders - multiple carrying College & Granite over West End Creek in Williamson County, Illinois. It was built in 1989, so it is 36 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 800 vehicles a day, roughly 9% of them trucks, projected to reach 808 by 2046. The structure is 38 ft (11.7 m) long and 52 ft wide.

CarriesCollege & Granite
CrossesWest End Creek
LocationMarion
RouteCity Street 0
Coordinates37.7299, -88.93143
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length38 ft (11.7 m)
Longest span36 ft (10.9 m)
Deck width52 ft (15.9 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic800 (2021)
Projected traffic808 by 2046
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was College & Granite over West End Creek built?

It was built in 1989, making it 36 years old in 2025.

What condition is College & Granite over West End Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does College & Granite over West End Creek carry?

About 800 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is College & Granite over West End Creek?

The structure is 38 ft (11.7 m) long with a longest span of 36 ft (10.9 m) and a deck 52 ft wide.

Who owns College & Granite over West End Creek?

It is owned by the City or Municipal Highway Agency.