Baseline Road over Intermodal Yard Lead
FairWill County, Illinois · 0.91 MI N/Arsenal RD · Structure no. 099991800000000
- Built
- 2010
- 15 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 215 ft
- 3 main spans
- Daily traffic
- 8,900
- 2023 count
- Owner
- Private
- Private (other than railroad)
About this bridge
Baseline Road over Intermodal Yard Lead is a prestressed concrete continuous stringer/multi-beam or girder carrying Baseline Road over Intermodal Yard Lead in Will County, Illinois. It was built in 2010, so it is 15 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,900 vehicles a day, roughly 75% of them trucks, projected to reach 13,104 by 2046. The structure is 215 ft (65.5 m) long and 77 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Baseline Road over Intermodal Yard Lead built?
It was built in 2010, making it 15 years old in 2025.
What condition is Baseline Road over Intermodal Yard Lead in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Baseline Road over Intermodal Yard Lead carry?
About 8,900 vehicles per day (2023 count), of which roughly 75% are trucks.
How long is Baseline Road over Intermodal Yard Lead?
The structure is 215 ft (65.5 m) long with a longest span of 75 ft (22.9 m) and a deck 77 ft wide.
Who owns Baseline Road over Intermodal Yard Lead?
It is owned by the Private (other than railroad).