US Bridges

Borio Drive over Wet Lands

Good

Will County, Illinois · 0.39 MI E CH88 · Structure no. 099600400000000

Built
2005
20 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete
Length
85 ft
19 main spans
Daily traffic
1,150
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Borio Drive over Wet Lands is a concrete culvert carrying Borio Drive over Wet Lands in Will County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,150 vehicles a day, roughly 4% of them trucks, projected to reach 1,656 by 2046. The structure is 85 ft (25.8 m) long.

CarriesBorio Drive
CrossesWet Lands
Location0.39 MI E CH88
RouteCity Street 0
Coordinates41.58917, -88.11525
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans19
Design loadUnknown
Structure length85 ft (25.8 m)
Longest span3 ft (0.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,150 (2023)
Projected traffic1,656 by 2046
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Borio Drive over Wet Lands built?

It was built in 2005, making it 20 years old in 2025.

What condition is Borio Drive over Wet Lands in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Borio Drive over Wet Lands carry?

About 1,150 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Borio Drive over Wet Lands?

The structure is 85 ft (25.8 m) long with a longest span of 3 ft (0.8 m).

Who owns Borio Drive over Wet Lands?

It is owned by the City or Municipal Highway Agency.