US Bridges

Gougar Road over Forked Creek

Fair

Will County, Illinois · O.4M S Wil-Peoto RD · Structure no. 099486200000000

Built
1993
32 years old
Condition
Fair
inspected June 2023
Type
Channel Beam
Concrete
Length
40 ft
1 main span
Daily traffic
75
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Gougar Road over Forked Creek is a concrete channel beam carrying Gougar Road over Forked Creek in Will County, Illinois. It was built in 1993, so it is 32 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 75 vehicles a day, projected to reach 108 by 2046. The structure is 40 ft (12.1 m) long and 30 ft wide.

CarriesGougar Road
CrossesForked Creek
LocationO.4M S Wil-Peoto RD
RouteCounty Highway 0
Coordinates41.33866, -87.9978
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length40 ft (12.1 m)
Longest span37 ft (11.2 m)
Deck width30 ft (9.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2020)
Projected traffic108 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Gougar Road over Forked Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is Gougar Road over Forked Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Gougar Road over Forked Creek carry?

About 75 vehicles per day (2020 count).

How long is Gougar Road over Forked Creek?

The structure is 40 ft (12.1 m) long with a longest span of 37 ft (11.2 m) and a deck 30 ft wide.

Who owns Gougar Road over Forked Creek?

It is owned by the Town or Township Highway Agency.