Scheer RD over Jackson Crk Trib
FairWill County, Illinois · 0.8 M No Baker RD · Structure no. 099455700000000
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 46 ft
- 1 main span
- Daily traffic
- 1,250
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Scheer RD over Jackson Crk Trib is a prestressed concrete box beam or girders - multiple carrying Scheer RD over Jackson Crk Trib in Will County, Illinois. It was built in 1994, so it is 31 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,250 vehicles a day, roughly 7% of them trucks, projected to reach 792 by 2046. The structure is 46 ft (14 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Scheer RD over Jackson Crk Trib built?
It was built in 1994, making it 31 years old in 2025.
What condition is Scheer RD over Jackson Crk Trib in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Scheer RD over Jackson Crk Trib carry?
About 1,250 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is Scheer RD over Jackson Crk Trib?
The structure is 46 ft (14 m) long with a longest span of 43 ft (13.1 m) and a deck 24 ft wide.
Who owns Scheer RD over Jackson Crk Trib?
It is owned by the Town or Township Highway Agency.