80th Av over Union Drainage Ditch
PoorWill County, Illinois · 0.20 MI S I-80 · Structure no. 099338800000000
- Built
- 1900
- 125 years old
- Condition
- Poor
- inspected July 2024
- Type
- Culvert
- Steel
- Length
- 36 ft
- 3 main spans
- Daily traffic
- 15,700
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
80th Av over Union Drainage Ditch is a steel culvert carrying 80th Av over Union Drainage Ditch in Will County, Illinois. It was built in 1900, so it is 125 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 15,700 vehicles a day, roughly 7% of them trucks, projected to reach 22,608 by 2046. The structure is 36 ft (11 m) long.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 80th Av over Union Drainage Ditch built?
It was built in 1900, making it 125 years old in 2025.
What condition is 80th Av over Union Drainage Ditch in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.
How much traffic does 80th Av over Union Drainage Ditch carry?
About 15,700 vehicles per day (2019 count), of which roughly 7% are trucks.
How long is 80th Av over Union Drainage Ditch?
The structure is 36 ft (11 m) long with a longest span of 10 ft (3 m).
Who owns 80th Av over Union Drainage Ditch?
It is owned by the County Highway Agency.