US Bridges

Elevator RD over Forked Creek Trib

Good

Will County, Illinois · 1 MI E US-52 · Structure no. 099336700000000

Built
2001
24 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
1,000
2023 count
Owner
County
County Highway Agency

About this bridge

Elevator RD over Forked Creek Trib is a concrete culvert carrying Elevator RD over Forked Creek Trib in Will County, Illinois. It was built in 2001, so it is 24 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 10% of them trucks, projected to reach 720 by 2046. The structure is 29 ft (8.7 m) long and 36 ft wide.

CarriesElevator RD
CrossesForked Creek Trib
Location1 MI E US-52
RouteCounty Highway 0
Coordinates41.38064, -87.94387
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckOther
Main spans2
Design loadHS 20
Structure length29 ft (8.7 m)
Longest span12 ft (3.7 m)
Deck width36 ft (11 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2023)
Projected traffic720 by 2046
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Elevator RD over Forked Creek Trib built?

It was built in 2001, making it 24 years old in 2025.

What condition is Elevator RD over Forked Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Elevator RD over Forked Creek Trib carry?

About 1,000 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Elevator RD over Forked Creek Trib?

The structure is 29 ft (8.7 m) long with a longest span of 12 ft (3.7 m) and a deck 36 ft wide.

Who owns Elevator RD over Forked Creek Trib?

It is owned by the County Highway Agency.