FAU-357 (rowell RD over Jackson Creek
FairWill County, Illinois · .6 MI N Manhattan RD · Structure no. 099330500000000
- Built
- 2017
- 8 years old
- Condition
- Fair
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 71 ft
- 1 main span
- Daily traffic
- 50
- 2016 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
FAU-357 (rowell RD over Jackson Creek is a prestressed concrete box beam or girders - multiple carrying FAU-357 (rowell RD over Jackson Creek in Will County, Illinois. It was built in 2017, so it is 8 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 30% of them trucks, projected to reach 72 by 2046. The structure is 71 ft (21.5 m) long and 30 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU-357 (rowell RD over Jackson Creek built?
It was built in 2017, making it 8 years old in 2025.
What condition is FAU-357 (rowell RD over Jackson Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does FAU-357 (rowell RD over Jackson Creek carry?
About 50 vehicles per day (2016 count), of which roughly 30% are trucks.
How long is FAU-357 (rowell RD over Jackson Creek?
The structure is 71 ft (21.5 m) long with a longest span of 68 ft (20.8 m) and a deck 30 ft wide.
Who owns FAU-357 (rowell RD over Jackson Creek?
It is owned by the Town or Township Highway Agency.