US Bridges

Richton RD (tr 219 over Plum Creek

Good

Will County, Illinois · 1.4 M E Ill RTE 394 · Structure no. 099328600000000

Built
2014
11 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
111 ft
1 main span
Daily traffic
—
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Richton RD (tr 219 over Plum Creek is a prestressed concrete stringer/multi-beam or girder carrying Richton RD (tr 219 over Plum Creek in Will County, Illinois. It was built in 2014, so it is 11 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 111 ft (33.8 m) long and 33 ft wide.

CarriesRichton RD (tr 219
CrossesPlum Creek
Location1.4 M E Ill RTE 394
RouteCounty Highway 0
Coordinates41.45596, -87.54596
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length111 ft (33.8 m)
Longest span107 ft (32.7 m)
Deck width33 ft (10.2 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic252 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Richton RD (tr 219 over Plum Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is Richton RD (tr 219 over Plum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Richton RD (tr 219 over Plum Creek carry?

No traffic count is recorded for this structure.

How long is Richton RD (tr 219 over Plum Creek?

The structure is 111 ft (33.8 m) long with a longest span of 107 ft (32.7 m) and a deck 33 ft wide.

Who owns Richton RD (tr 219 over Plum Creek?

It is owned by the Town or Township Highway Agency.