Peotone-Beecher RD over Exline Slough
GoodWill County, Illinois · 3 MI West of Il 1 · Structure no. 099310000000000
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 3,650
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Peotone-Beecher RD over Exline Slough is a prestressed concrete stringer/multi-beam or girder carrying Peotone-Beecher RD over Exline Slough in Will County, Illinois. It was built in 2014, so it is 11 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,650 vehicles a day, roughly 8% of them trucks, projected to reach 4,968 by 2046. The structure is 52 ft (15.8 m) long and 47 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Peotone-Beecher RD over Exline Slough built?
It was built in 2014, making it 11 years old in 2025.
What condition is Peotone-Beecher RD over Exline Slough in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Peotone-Beecher RD over Exline Slough carry?
About 3,650 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is Peotone-Beecher RD over Exline Slough?
The structure is 52 ft (15.8 m) long with a longest span of 48 ft (14.6 m) and a deck 47 ft wide.
Who owns Peotone-Beecher RD over Exline Slough?
It is owned by the County Highway Agency.