US Bridges

FAU-1637 Stuenkelr over East Br Hickory CR

Good

Will County, Illinois · 0.2M W Central Av. · Structure no. 099061000000000

Built
2015
10 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
4,725
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU-1637 Stuenkelr over East Br Hickory CR is a concrete culvert carrying FAU-1637 Stuenkelr over East Br Hickory CR in Will County, Illinois. It was built in 2015, so it is 10 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,725 vehicles a day, roughly 24% of them trucks, projected to reach 6,948 by 2046. The structure is 31 ft (9.3 m) long.

CarriesFAU-1637 Stuenkelr
CrossesEast Br Hickory CR
Location0.2M W Central Av.
Coordinates41.45602, -87.75245
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.3 US tons
Inventory rating61.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 25 or greater
Structure length31 ft (9.3 m)
Longest span15 ft (4.6 m)
Deck width0 ft (0 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,725 (2023)
Projected traffic6,948 by 2046
Trucks24%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU-1637 Stuenkelr over East Br Hickory CR built?

It was built in 2015, making it 10 years old in 2025.

What condition is FAU-1637 Stuenkelr over East Br Hickory CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does FAU-1637 Stuenkelr over East Br Hickory CR carry?

About 4,725 vehicles per day (2023 count), of which roughly 24% are trucks.

How long is FAU-1637 Stuenkelr over East Br Hickory CR?

The structure is 31 ft (9.3 m) long with a longest span of 15 ft (4.6 m).

Who owns FAU-1637 Stuenkelr over East Br Hickory CR?

It is owned by the City or Municipal Highway Agency.