I- 80 WB over Joliet Jnct Ped/Bike
PoorWill County, Illinois · 1 M W of Il 7 · Structure no. 099004900000000
- Built
- 1964
- 61 years old
- Condition
- Poor
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 165 ft
- 3 main spans
- Daily traffic
- 19,350
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I- 80 WB over Joliet Jnct Ped/Bike is a steel continuous stringer/multi-beam or girder carrying I- 80 WB over Joliet Jnct Ped/Bike in Will County, Illinois. It was built in 1964, so it is 61 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 19,350 vehicles a day, roughly 39% of them trucks, projected to reach 38,160 by 2046. The structure is 165 ft (50.3 m) long and 37 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I- 80 WB over Joliet Jnct Ped/Bike built?
It was built in 1964, making it 61 years old in 2025.
What condition is I- 80 WB over Joliet Jnct Ped/Bike in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2023.
How much traffic does I- 80 WB over Joliet Jnct Ped/Bike carry?
About 19,350 vehicles per day (2023 count), of which roughly 39% are trucks.
How long is I- 80 WB over Joliet Jnct Ped/Bike?
The structure is 165 ft (50.3 m) long with a longest span of 62 ft (19 m) and a deck 37 ft wide.
Who owns I- 80 WB over Joliet Jnct Ped/Bike?
It is owned by the State Highway Agency.