TR153 Benson RD over Trib to Spring Creek
GoodWhiteside County, Illinois · 400 Ft W Kennedy RD · Structure no. 098416200000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 50
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR153 Benson RD over Trib to Spring Creek is a prestressed concrete box beam or girders - multiple carrying TR153 Benson RD over Trib to Spring Creek in Whiteside County, Illinois. It was built in 2022, so it is 3 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 6% of them trucks, projected to reach 50 by 2040. The structure is 40 ft (12.2 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR153 Benson RD over Trib to Spring Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is TR153 Benson RD over Trib to Spring Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does TR153 Benson RD over Trib to Spring Creek carry?
About 50 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is TR153 Benson RD over Trib to Spring Creek?
The structure is 40 ft (12.2 m) long with a longest span of 38 ft (11.6 m) and a deck 28 ft wide.
Who owns TR153 Benson RD over Trib to Spring Creek?
It is owned by the Town or Township Highway Agency.