Science Ridge Road over Elkhorn Creek
FairWhiteside County, Illinois · 1 MI NW of Sterling · Structure no. 098302600000000
- Built
- 1958
- 67 years old, rebuilt 1963
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 230 ft
- 3 main spans
- Daily traffic
- 2,300
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Science Ridge Road over Elkhorn Creek is a steel continuous stringer/multi-beam or girder carrying Science Ridge Road over Elkhorn Creek in Whiteside County, Illinois. It was built in 1958 and reconstructed in 1963, so it is 67 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,300 vehicles a day, roughly 8% of them trucks, projected to reach 2,323 by 2046. The structure is 230 ft (70 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Science Ridge Road over Elkhorn Creek built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1963.
What condition is Science Ridge Road over Elkhorn Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Science Ridge Road over Elkhorn Creek carry?
About 2,300 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is Science Ridge Road over Elkhorn Creek?
The structure is 230 ft (70 m) long with a longest span of 88 ft (26.8 m) and a deck 30 ft wide.
Who owns Science Ridge Road over Elkhorn Creek?
It is owned by the Town or Township Highway Agency.