US Bridges

Il 40 over Branch Ditch

Good

Whiteside County, Illinois · 2.2 MI N Deer Grove · Structure no. 098010400000000

Built
1996
29 years old
Condition
Good
inspected August 2022
Type
Stringer/Multi-beam or Girder
Steel
Length
52 ft
1 main span
Daily traffic
2,900
2021 count
Owner
State
State Highway Agency

About this bridge

Il 40 over Branch Ditch is a steel stringer/multi-beam or girder carrying Il 40 over Branch Ditch in Whiteside County, Illinois. It was built in 1996, so it is 29 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,900 vehicles a day, roughly 19% of them trucks, projected to reach 2,929 by 2046. The structure is 52 ft (15.9 m) long and 35 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesIl 40
CrossesBranch Ditch
Location2.2 MI N Deer Grove
RouteState Highway 40
Coordinates41.64469, -89.68979
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.6 US tons
Inventory rating38.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length52 ft (15.9 m)
Longest span50 ft (15.1 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,900 (2021)
Projected traffic2,929 by 2046
Trucks19%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Il 40 over Branch Ditch built?

It was built in 1996, making it 29 years old in 2025.

What condition is Il 40 over Branch Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.

How much traffic does Il 40 over Branch Ditch carry?

About 2,900 vehicles per day (2021 count), of which roughly 19% are trucks.

How long is Il 40 over Branch Ditch?

The structure is 52 ft (15.9 m) long with a longest span of 50 ft (15.1 m) and a deck 35 ft wide.

Who owns Il 40 over Branch Ditch?

It is owned by the State Highway Agency.