Ch 13 over Trib to Limekiln CR
GoodWhite County, Illinois · 3 MI W Centerville · Structure no. 097326900000000
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 46 ft
- 1 main span
- Daily traffic
- 150
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 13 over Trib to Limekiln CR is a prestressed concrete box beam or girders - multiple carrying Ch 13 over Trib to Limekiln CR in White County, Illinois. It was built in 2014, so it is 11 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 53% of them trucks, projected to reach 76 by 2046. The structure is 46 ft (14.1 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 13 over Trib to Limekiln CR built?
It was built in 2014, making it 11 years old in 2025.
What condition is Ch 13 over Trib to Limekiln CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Ch 13 over Trib to Limekiln CR carry?
About 150 vehicles per day (2024 count), of which roughly 53% are trucks.
How long is Ch 13 over Trib to Limekiln CR?
The structure is 46 ft (14.1 m) long with a longest span of 44 ft (13.4 m) and a deck 24 ft wide.
Who owns Ch 13 over Trib to Limekiln CR?
It is owned by the County Highway Agency.