400 E over Prairie Creek
FairWhite County, Illinois · 3.5 M NE Springerton · Structure no. 097325300000000
- Built
- 2014
- 11 years old
- Condition
- Fair
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 81 ft
- 1 main span
- Daily traffic
- 20
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
400 E over Prairie Creek is a prestressed concrete box beam or girders - multiple carrying 400 E over Prairie Creek in White County, Illinois. It was built in 2014, so it is 11 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20 vehicles a day, roughly 30% of them trucks, projected to reach 10 by 2046. The structure is 81 ft (24.8 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 400 E over Prairie Creek built?
It was built in 2014, making it 11 years old in 2025.
What condition is 400 E over Prairie Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does 400 E over Prairie Creek carry?
About 20 vehicles per day (2024 count), of which roughly 30% are trucks.
How long is 400 E over Prairie Creek?
The structure is 81 ft (24.8 m) long with a longest span of 79 ft (24 m) and a deck 24 ft wide.
Who owns 400 E over Prairie Creek?
It is owned by the Town or Township Highway Agency.