US Bridges

TR-219 over Drainage Ditch

Fair

White County, Illinois · 3.5 MI SE Enfield · Structure no. 097320700000000

Built
1991
34 years old
Condition
Fair
inspected February 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
41 ft
1 main span
Daily traffic
20
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR-219 over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying TR-219 over Drainage Ditch in White County, Illinois. It was built in 1991, so it is 34 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20 vehicles a day, roughly 25% of them trucks, projected to reach 10 by 2046. The structure is 41 ft (12.6 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR-219
CrossesDrainage Ditch
Location3.5 MI SE Enfield
RouteCounty Highway 0
Coordinates38.06823, -88.28247
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length41 ft (12.6 m)
Longest span39 ft (11.8 m)
Deck width28 ft (8.6 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2024)
Projected traffic10 by 2046
Trucks25%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR-219 over Drainage Ditch built?

It was built in 1991, making it 34 years old in 2025.

What condition is TR-219 over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does TR-219 over Drainage Ditch carry?

About 20 vehicles per day (2024 count), of which roughly 25% are trucks.

How long is TR-219 over Drainage Ditch?

The structure is 41 ft (12.6 m) long with a longest span of 39 ft (11.8 m) and a deck 28 ft wide.

Who owns TR-219 over Drainage Ditch?

It is owned by the Town or Township Highway Agency.