FAP-782 (ILL-1) over Indian Creek
FairWhite County, Illinois · 1.5 MI S ILL-1/US-45 · Structure no. 097002600000000
- Built
- 1929
- 96 years old, rebuilt 2009
- Condition
- Fair
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 49 ft
- 1 main span
- Daily traffic
- 4,400
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP-782 (ILL-1) over Indian Creek is a prestressed concrete box beam or girders - multiple carrying FAP-782 (ILL-1) over Indian Creek in White County, Illinois. It was built in 1929 and reconstructed in 2009, so it is 96 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,400 vehicles a day, roughly 13% of them trucks, projected to reach 2,071 by 2046. The structure is 49 ft (15 m) long and 33 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP-782 (ILL-1) over Indian Creek built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 2009.
What condition is FAP-782 (ILL-1) over Indian Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does FAP-782 (ILL-1) over Indian Creek carry?
About 4,400 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is FAP-782 (ILL-1) over Indian Creek?
The structure is 49 ft (15 m) long with a longest span of 47 ft (14.2 m) and a deck 33 ft wide.
Who owns FAP-782 (ILL-1) over Indian Creek?
It is owned by the State Highway Agency.