TR 558 over Pond Creek Drain Dit
GoodWayne County, Illinois · 3 MI SW Golden Gate · Structure no. 096347400000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected August 2024
- Type
- Slab
- Concrete
- Length
- 98 ft
- 3 main spans
- Daily traffic
- 25
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 558 over Pond Creek Drain Dit is a concrete slab carrying TR 558 over Pond Creek Drain Dit in Wayne County, Illinois. It was built in 2022, so it is 3 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25 vehicles a day, roughly 8% of them trucks, projected to reach 26 by 2046. The structure is 98 ft (30 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 558 over Pond Creek Drain Dit built?
It was built in 2022, making it 3 years old in 2025.
What condition is TR 558 over Pond Creek Drain Dit in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does TR 558 over Pond Creek Drain Dit carry?
About 25 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is TR 558 over Pond Creek Drain Dit?
The structure is 98 ft (30 m) long with a longest span of 37 ft (11.4 m) and a deck 24 ft wide.
Who owns TR 558 over Pond Creek Drain Dit?
It is owned by the Town or Township Highway Agency.