FAP 821 (il 15) over Miller Creek
GoodWayne County, Illinois · 1.0 Mi. W Sims RD · Structure no. 096007600000000
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected September 2024
- Type
- Slab
- Concrete
- Length
- 74 ft
- 2 main spans
- Daily traffic
- 3,050
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 821 (il 15) over Miller Creek is a concrete slab carrying FAP 821 (il 15) over Miller Creek in Wayne County, Illinois. It was built in 2024, so it is 1 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,050 vehicles a day, roughly 10% of them trucks, projected to reach 3,200 by 2046. The structure is 74 ft (22.6 m) long and 39 ft wide. If it were closed, the detour would be 54.1 mi (87 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 821 (il 15) over Miller Creek built?
It was built in 2024, making it 1 years old in 2025.
What condition is FAP 821 (il 15) over Miller Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does FAP 821 (il 15) over Miller Creek carry?
About 3,050 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is FAP 821 (il 15) over Miller Creek?
The structure is 74 ft (22.6 m) long with a longest span of 33 ft (10 m) and a deck 39 ft wide.
Who owns FAP 821 (il 15) over Miller Creek?
It is owned by the State Highway Agency.