TR 277 over Branch of Mud Creek
GoodWashington County, Illinois · 1 Mile NE of Tilden · Structure no. 095317800000000
- Built
- 1984
- 41 years old
- Condition
- Good
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 53 ft
- 1 main span
- Daily traffic
- 1,150
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 277 over Branch of Mud Creek is a prestressed concrete box beam or girders - multiple carrying TR 277 over Branch of Mud Creek in Washington County, Illinois. It was built in 1984, so it is 41 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,150 vehicles a day, roughly 8% of them trucks, projected to reach 151 by 2046. The structure is 53 ft (16.2 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 277 over Branch of Mud Creek built?
It was built in 1984, making it 41 years old in 2025.
What condition is TR 277 over Branch of Mud Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does TR 277 over Branch of Mud Creek carry?
About 1,150 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is TR 277 over Branch of Mud Creek?
The structure is 53 ft (16.2 m) long with a longest span of 49 ft (14.9 m) and a deck 24 ft wide.
Who owns TR 277 over Branch of Mud Creek?
It is owned by the Town or Township Highway Agency.