FAS 450 - Ch 19 over Little Swan Creek
GoodWarren County, Illinois · NW-25-T8NR2W · Structure no. 094452400000000
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 75
- 2016 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
FAS 450 - Ch 19 over Little Swan Creek is a prestressed concrete box beam or girders - multiple carrying FAS 450 - Ch 19 over Little Swan Creek in Warren County, Illinois. It was built in 1986, so it is 39 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, roughly 19% of them trucks, projected to reach 76 by 2046. The structure is 62 ft (18.9 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 450 - Ch 19 over Little Swan Creek built?
It was built in 1986, making it 39 years old in 2025.
What condition is FAS 450 - Ch 19 over Little Swan Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does FAS 450 - Ch 19 over Little Swan Creek carry?
About 75 vehicles per day (2016 count), of which roughly 19% are trucks.
How long is FAS 450 - Ch 19 over Little Swan Creek?
The structure is 62 ft (18.9 m) long with a longest span of 59 ft (18 m) and a deck 28 ft wide.
Who owns FAS 450 - Ch 19 over Little Swan Creek?
It is owned by the Town or Township Highway Agency.