US Bridges

TR 52 over Drainage Ditch

Good

Wabash County, Illinois · 2.25 MI Sse Gards Pt · Structure no. 093313400000000

Built
2012
13 years old
Condition
Good
inspected February 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
75
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 52 over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying TR 52 over Drainage Ditch in Wabash County, Illinois. It was built in 2012, so it is 13 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, roughly 9% of them trucks, projected to reach 76 by 2046. The structure is 55 ft (16.8 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 52
CrossesDrainage Ditch
Location2.25 MI Sse Gards Pt
RouteCounty Highway 0
Coordinates38.4445, -87.89236
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length55 ft (16.8 m)
Longest span55 ft (16.8 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2022)
Projected traffic76 by 2046
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 52 over Drainage Ditch built?

It was built in 2012, making it 13 years old in 2025.

What condition is TR 52 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2022.

How much traffic does TR 52 over Drainage Ditch carry?

About 75 vehicles per day (2022 count), of which roughly 9% are trucks.

How long is TR 52 over Drainage Ditch?

The structure is 55 ft (16.8 m) long with a longest span of 55 ft (16.8 m) and a deck 24 ft wide.

Who owns TR 52 over Drainage Ditch?

It is owned by the Town or Township Highway Agency.