US Bridges

TR 211 over Stream

Good

Vermilion County, Illinois · 4 MI N of Fithian · Structure no. 092345800000000

Built
2001
24 years old
Condition
Good
inspected February 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
51 ft
1 main span
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 211 over Stream is a prestressed concrete box beam or girders - multiple carrying TR 211 over Stream in Vermilion County, Illinois. It was built in 2001, so it is 24 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 4% of them trucks, projected to reach 51 by 2046. The structure is 51 ft (15.6 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 211
CrossesStream
Location4 MI N of Fithian
RouteCounty Highway 0
Coordinates40.17159, -87.89045
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length51 ft (15.6 m)
Longest span49 ft (14.8 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic51 by 2046
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 211 over Stream built?

It was built in 2001, making it 24 years old in 2025.

What condition is TR 211 over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does TR 211 over Stream carry?

About 50 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is TR 211 over Stream?

The structure is 51 ft (15.6 m) long with a longest span of 49 ft (14.8 m) and a deck 27 ft wide.

Who owns TR 211 over Stream?

It is owned by the Town or Township Highway Agency.