US Bridges

TR 35 over Stream

Fair

Vermilion County, Illinois · 4.5 MI NE Rossville · Structure no. 092343700000000

Built
1995
30 years old
Condition
Fair
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
66 ft
5 main spans
Daily traffic
75
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 35 over Stream is a prestressed concrete box beam or girders - multiple carrying TR 35 over Stream in Vermilion County, Illinois. It was built in 1995, so it is 30 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 75 vehicles a day, roughly 3% of them trucks, projected to reach 76 by 2046. The structure is 66 ft (20.2 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 35
CrossesStream
Location4.5 MI NE Rossville
RouteCounty Highway 0
Coordinates40.41127, -87.73537
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans5 (+5 approach)
Design loadHS 20
Structure length66 ft (20.2 m)
Longest span65 ft (19.8 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2023)
Projected traffic76 by 2046
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 35 over Stream built?

It was built in 1995, making it 30 years old in 2025.

What condition is TR 35 over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does TR 35 over Stream carry?

About 75 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is TR 35 over Stream?

The structure is 66 ft (20.2 m) long with a longest span of 65 ft (19.8 m) and a deck 27 ft wide.

Who owns TR 35 over Stream?

It is owned by the Town or Township Highway Agency.