TR 3 over N Fork Vermilion Riv
GoodVermilion County, Illinois · 5 MI NE Hoopeston · Structure no. 092331900000000
- Built
- 1980
- 45 years old
- Condition
- Good
- inspected February 2021
- Type
- Channel Beam
- Concrete
- Length
- 94 ft
- 3 main spans
- Daily traffic
- 50
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 3 over N Fork Vermilion Riv is a concrete channel beam carrying TR 3 over N Fork Vermilion Riv in Vermilion County, Illinois. It was built in 1980, so it is 45 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 4% of them trucks, projected to reach 51 by 2046. The structure is 94 ft (28.7 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 3 over N Fork Vermilion Riv built?
It was built in 1980, making it 45 years old in 2025.
What condition is TR 3 over N Fork Vermilion Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.
How much traffic does TR 3 over N Fork Vermilion Riv carry?
About 50 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is TR 3 over N Fork Vermilion Riv?
The structure is 94 ft (28.7 m) long with a longest span of 38 ft (11.6 m) and a deck 26 ft wide.
Who owns TR 3 over N Fork Vermilion Riv?
It is owned by the Town or Township Highway Agency.