Ill 119(FAP 711) over N Fork Vermilion Riv
GoodVermilion County, Illinois · 2 MI E of Il 1 · Structure no. 092020700000000
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 293 ft
- 4 main spans
- Daily traffic
- 1,350
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Ill 119(FAP 711) over N Fork Vermilion Riv is a concrete continuous stringer/multi-beam or girder carrying Ill 119(FAP 711) over N Fork Vermilion Riv in Vermilion County, Illinois. It was built in 2013, so it is 12 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,350 vehicles a day, roughly 12% of them trucks, projected to reach 1,212 by 2046. The structure is 293 ft (89.2 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ill 119(FAP 711) over N Fork Vermilion Riv built?
It was built in 2013, making it 12 years old in 2025.
What condition is Ill 119(FAP 711) over N Fork Vermilion Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Ill 119(FAP 711) over N Fork Vermilion Riv carry?
About 1,350 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is Ill 119(FAP 711) over N Fork Vermilion Riv?
The structure is 293 ft (89.2 m) long with a longest span of 80 ft (24.4 m) and a deck 35 ft wide.
Who owns Ill 119(FAP 711) over N Fork Vermilion Riv?
It is owned by the State Highway Agency.