US Bridges

FAP 332(IL 1) over Creek

Good

Vermilion County, Illinois · S Edge Hoopeston · Structure no. 092019100000000

Built
1992
33 years old
Condition
Good
inspected January 2025
Type
Slab
Concrete Continuous
Length
85 ft
3 main spans
Daily traffic
4,950
2023 count
Owner
State
State Highway Agency

About this bridge

FAP 332(IL 1) over Creek is a concrete continuous slab carrying FAP 332(IL 1) over Creek in Vermilion County, Illinois. It was built in 1992, so it is 33 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,950 vehicles a day, roughly 9% of them trucks, projected to reach 4,293 by 2046. The structure is 85 ft (25.8 m) long and 43 ft wide. If it were closed, the detour would be 23 mi (37 km).

CarriesFAP 332(IL 1)
CrossesCreek
LocationS Edge Hoopeston
RouteState Highway 1
Coordinates40.45591, -87.68712
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.4 US tons
Inventory rating45.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length85 ft (25.8 m)
Longest span31 ft (9.4 m)
Deck width43 ft (13.2 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,950 (2023)
Projected traffic4,293 by 2046
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed23 mi (37 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 332(IL 1) over Creek built?

It was built in 1992, making it 33 years old in 2025.

What condition is FAP 332(IL 1) over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does FAP 332(IL 1) over Creek carry?

About 4,950 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is FAP 332(IL 1) over Creek?

The structure is 85 ft (25.8 m) long with a longest span of 31 ft (9.4 m) and a deck 43 ft wide.

Who owns FAP 332(IL 1) over Creek?

It is owned by the State Highway Agency.