FAS 512(CH 8) over Olive Branch
GoodVermilion County, Illinois · 3.4 MI W Fairmount · Structure no. 092009100000000
- Built
- 1962
- 63 years old, rebuilt 2017
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 122 ft
- 3 main spans
- Daily traffic
- 1,750
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 512(CH 8) over Olive Branch is a steel continuous stringer/multi-beam or girder carrying FAS 512(CH 8) over Olive Branch in Vermilion County, Illinois. It was built in 1962 and reconstructed in 2017, so it is 63 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,750 vehicles a day, roughly 18% of them trucks, projected to reach 1,515 by 2046. The structure is 122 ft (37.2 m) long and 32 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 512(CH 8) over Olive Branch built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2017.
What condition is FAS 512(CH 8) over Olive Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does FAS 512(CH 8) over Olive Branch carry?
About 1,750 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is FAS 512(CH 8) over Olive Branch?
The structure is 122 ft (37.2 m) long with a longest span of 44 ft (13.3 m) and a deck 32 ft wide.
Who owns FAS 512(CH 8) over Olive Branch?
It is owned by the County Highway Agency.