US Bridges

Bartsch LA over Trib to Clear Creek

Good

Union County, Illinois · Mountain Glenn · Structure no. 091323700000000

Built
2013
12 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
53 ft
1 main span
Daily traffic
25
2020 count
Owner
County
County Highway Agency

About this bridge

Bartsch LA over Trib to Clear Creek is a prestressed concrete box beam or girders - multiple carrying Bartsch LA over Trib to Clear Creek in Union County, Illinois. It was built in 2013, so it is 12 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, projected to reach 25 by 2046. The structure is 53 ft (16.3 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBartsch LA
CrossesTrib to Clear Creek
LocationMountain Glenn
RouteCounty Highway 0
Coordinates37.52529, -89.2919
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length53 ft (16.3 m)
Longest span51 ft (15.6 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2020)
Projected traffic25 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bartsch LA over Trib to Clear Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is Bartsch LA over Trib to Clear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Bartsch LA over Trib to Clear Creek carry?

About 25 vehicles per day (2020 count).

How long is Bartsch LA over Trib to Clear Creek?

The structure is 53 ft (16.3 m) long with a longest span of 51 ft (15.6 m) and a deck 24 ft wide.

Who owns Bartsch LA over Trib to Clear Creek?

It is owned by the County Highway Agency.