US Bridges

Morris Hill RD-TR9 over Stream

Fair

Tazewell County, Illinois · SW COR-8-T22NR4W · Structure no. 090322300000000

Built
2000
25 years old
Condition
Fair
inspected January 2024
Type
Channel Beam
Concrete
Length
98 ft
3 main spans
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Morris Hill RD-TR9 over Stream is a concrete channel beam carrying Morris Hill RD-TR9 over Stream in Tazewell County, Illinois. It was built in 2000, so it is 25 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 98 ft (30 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMorris Hill RD-TR9
CrossesStream
LocationSW COR-8-T22NR4W
RouteCounty Highway 0
Coordinates40.3654, -89.58519
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length98 ft (30 m)
Longest span36 ft (11 m)
Deck width26 ft (8 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic51 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Morris Hill RD-TR9 over Stream built?

It was built in 2000, making it 25 years old in 2025.

What condition is Morris Hill RD-TR9 over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Morris Hill RD-TR9 over Stream carry?

About 50 vehicles per day (2023 count).

How long is Morris Hill RD-TR9 over Stream?

The structure is 98 ft (30 m) long with a longest span of 36 ft (11 m) and a deck 26 ft wide.

Who owns Morris Hill RD-TR9 over Stream?

It is owned by the Town or Township Highway Agency.