I74 Rp 1.05(H-3) over I74 Rmps H-1 4 Divr Cha
FairTazewell County, Illinois · East Peoria · Structure no. 090015300000000
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,455 ft
- 8 main spans
- Daily traffic
- 2,600
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I74 Rp 1.05(H-3) over I74 Rmps H-1 4 Divr Cha is a steel continuous stringer/multi-beam or girder carrying I74 Rp 1.05(H-3) over I74 Rmps H-1 4 Divr Cha in Tazewell County, Illinois. It was built in 2004, so it is 21 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,600 vehicles a day, roughly 13% of them trucks, projected to reach 2,626 by 2046. The structure is 1,455 ft (443.4 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I74 Rp 1.05(H-3) over I74 Rmps H-1 4 Divr Cha built?
It was built in 2004, making it 21 years old in 2025.
What condition is I74 Rp 1.05(H-3) over I74 Rmps H-1 4 Divr Cha in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does I74 Rp 1.05(H-3) over I74 Rmps H-1 4 Divr Cha carry?
About 2,600 vehicles per day (2021 count), of which roughly 13% are trucks.
How long is I74 Rp 1.05(H-3) over I74 Rmps H-1 4 Divr Cha?
The structure is 1,455 ft (443.4 m) long with a longest span of 235 ft (71.7 m) and a deck 39 ft wide.
Who owns I74 Rp 1.05(H-3) over I74 Rmps H-1 4 Divr Cha?
It is owned by the State Highway Agency.