Gold Mine RD over E Plum River
GoodStephenson County, Illinois · 3 Mi. West Pearl Cty · Structure no. 089328100000000
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 78 ft
- 3 main spans
- Daily traffic
- 525
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Gold Mine RD over E Plum River is a concrete continuous slab carrying Gold Mine RD over E Plum River in Stephenson County, Illinois. It was built in 2010, so it is 15 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 525 vehicles a day, roughly 4% of them trucks, projected to reach 631 by 2046. The structure is 78 ft (23.8 m) long and 30 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gold Mine RD over E Plum River built?
It was built in 2010, making it 15 years old in 2025.
What condition is Gold Mine RD over E Plum River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Gold Mine RD over E Plum River carry?
About 525 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is Gold Mine RD over E Plum River?
The structure is 78 ft (23.8 m) long with a longest span of 27 ft (8.2 m) and a deck 30 ft wide.
Who owns Gold Mine RD over E Plum River?
It is owned by the County Highway Agency.