North Stubbe Road over Br of Pecatonica Riv
GoodStephenson County, Illinois · 3.0 MI SE Winslow · Structure no. 089310800000000
- Built
- 1965
- 60 years old
- Condition
- Good
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 75
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
North Stubbe Road over Br of Pecatonica Riv is a prestressed concrete box beam or girders - multiple carrying North Stubbe Road over Br of Pecatonica Riv in Stephenson County, Illinois. It was built in 1965, so it is 60 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, projected to reach 76 by 2046. The structure is 40 ft (12.2 m) long and 24 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Stubbe Road over Br of Pecatonica Riv built?
It was built in 1965, making it 60 years old in 2025.
What condition is North Stubbe Road over Br of Pecatonica Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does North Stubbe Road over Br of Pecatonica Riv carry?
About 75 vehicles per day (2020 count).
How long is North Stubbe Road over Br of Pecatonica Riv?
The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 24 ft wide.
Who owns North Stubbe Road over Br of Pecatonica Riv?
It is owned by the Town or Township Highway Agency.