FAP 316-IL 26 over Brush Creek
FairStephenson County, Illinois · 1.7 MI S Orangeville · Structure no. 089006400000000
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected November 2021
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 149 ft
- 3 main spans
- Daily traffic
- 4,600
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 316-IL 26 over Brush Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 316-IL 26 over Brush Creek in Stephenson County, Illinois. It was built in 1991, so it is 34 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,600 vehicles a day, roughly 10% of them trucks, projected to reach 4,949 by 2046. The structure is 149 ft (45.4 m) long and 47 ft wide. If it were closed, the detour would be 21.7 mi (35 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 316-IL 26 over Brush Creek built?
It was built in 1991, making it 34 years old in 2025.
What condition is FAP 316-IL 26 over Brush Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2021.
How much traffic does FAP 316-IL 26 over Brush Creek carry?
About 4,600 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is FAP 316-IL 26 over Brush Creek?
The structure is 149 ft (45.4 m) long with a longest span of 54 ft (16.6 m) and a deck 47 ft wide.
Who owns FAP 316-IL 26 over Brush Creek?
It is owned by the State Highway Agency.