US Bridges

TR 62 over Jack Creek

Good

Stark County, Illinois · NW-4-T13NR6E · Structure no. 088540300000000

Built
1994
31 years old
Condition
Good
inspected October 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
122 ft
3 main spans
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 62 over Jack Creek is a prestressed concrete box beam or girders - multiple carrying TR 62 over Jack Creek in Stark County, Illinois. It was built in 1994, so it is 31 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 122 ft (37.1 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 62
CrossesJack Creek
LocationNW-4-T13NR6E
RouteCounty Highway 0
Coordinates41.14773, -89.824
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length122 ft (37.1 m)
Longest span60 ft (18.3 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic51 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 62 over Jack Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is TR 62 over Jack Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.

How much traffic does TR 62 over Jack Creek carry?

About 50 vehicles per day (2023 count).

How long is TR 62 over Jack Creek?

The structure is 122 ft (37.1 m) long with a longest span of 60 ft (18.3 m) and a deck 28 ft wide.

Who owns TR 62 over Jack Creek?

It is owned by the Town or Township Highway Agency.